New heating
by resolution.
No special levy.
The heating is old, the Building Energy Act sets deadlines, and nobody at the owners' meeting wants to vote for a six-figure special levy. A provider builds, finances and operates the new heat supply. The association only pays the agreed heat price.

- €0special levy for the conversion
- 15 yearsfixed heat price, at least 10
- Meeting preparedoffer and documents for the resolution
Heating retrofits rarely fail on technology, but on money and majorities.
Everyone has to agree
Owner-occupiers, investors and older owners have different interests. A large investment rarely finds a majority at the meeting.
The reserve is not enough
A new boiler room costs six figures. A special levy hits every owner, so the topic is postponed year after year.
Time is running out
The Building Energy Act and municipal heat planning set deadlines, the CO₂ price on gas and oil rises. Flats in buildings of classes G and H sell and finance worse.
Where your building needs heat
- Flats
- Bathrooms and hot water
- Stairwells
- Common rooms
- Boiler room
- Commercial units
Buy heat instead of owning a heating system
Own retrofit
- Special levy or reserve for the conversion
- Manager and board plan, tender and supervise
- An outage in winter is the association's risk
- Heat price fluctuates with the market
- Resolution on financing and technology
With NetZero
- The provider bears the conversion costs
- The provider plans, finances and operates
- Fault service and response times in the contract
- Heat price fixed for 10 to 15 years
- Resolution only on the heat supply contract
Heat costs run through the annual statement as before. Kola NetZero is paid by the provider, the assessment is free for the association.
What gets installed in the common property
Planning, conversion and operation are handled by the provider. Tap the points on the image.

Not required for the switch. If the roof and the numbers fit, the provider can add photovoltaics.
Take over most of the heat generation, the existing boiler stays in the system. The outdoor units stand enclosed on the property.
The heat pumps are connected to the existing boiler room in the common property. No intervention in individual flats.
Sensors and valves in the basement continuously balance the pipe network and lower the flow temperature without any flat getting cooler.
No intervention in the flats
Work only takes place in the common property: boiler room, outdoor area and roof. The switch-over is planned outside the heating season and coordinated with the manager.
Assessment
Site visit of boiler room and roof, design based on the building's actual consumption.
Meeting
Offer and documents for the owners' meeting, the manager puts the topic on the agenda.
Implementation
Work in the boiler room, outside and on the roof, switch-over outside the heating season.
Operation
Maintenance, fault service and billing sit with the provider.
- No access to the flats
- No scaffolding on the facade
- No special levy
Which associations qualify
- From 6 residential unitsNo upper limit. Several buildings of one association are assessed together.
- Central heating systemOne system for the building in common property. Individual gas boilers per flat do not qualify.
- Energy class E or worseAccording to the certificate. For district heating we also look at better classes.
- Manager or advisory board as contactThey bring the offer and documents to the meeting.
- Heating costs run through the associationAnd are allocated through the annual statement.
What every flat gains
Better energy class
Depending on the starting point up to five classes better. That applies to the whole building and therefore to every flat, in sale, letting and financing.
Predictable heat costs
A fixed price per kilowatt hour instead of fluctuating gas prices. Letting owners pass the costs on through the service charges as before.
Reserve stays untouched
No special levy, and the maintenance reserve remains available for other measures on the building.
From energy class G to B in under a week
Two apartment buildings in Rhineland-Palatinate, converted without any investment by the owners. The existing boiler stays in the system, the heat pumps cover most of the heat generation.
Apartment building, 12 residential units
Figures according to the heat provider's project documentation. CO₂ on a balance-sheet basis under BEHG. Energy class indicative. Property data anonymised.
Four steps to the resolution
- 1
Submit the property
Address and key data, plus energy certificate and heating cost statements. Takes two minutes, we read the key data from your documents.
- 2
Calculation
We check the data and align the design with the provider. Feedback usually within 5 working days.
- 3
Offer and site visit
Written offer with a guaranteed heat price, site visit of boiler room, floor space and roof.
- 4
Resolution and implementation
The owners' meeting resolves on the heat supply contract, then the switch-over is scheduled outside the heating season.
Frequently asked by managers and owners
Who signs the heat supply contract?
The owners' association as a legal entity, represented by the manager, based on a resolution of the owners' meeting.
Which majority does the resolution need?
Since the 2020 reform, structural changes can usually be resolved by simple majority (section 20 WEG); cost allocation is governed by section 21 WEG. How the resolution must be passed in your association is checked by the manager against the declaration of division.
What does the individual owner pay?
No special levy. Heat costs run through the annual statement as before, allocated by the applicable key.
What changes for let flats?
Tenants receive heat as before and pay for it through the service charges. Switching to heat supply is regulated in section 556c of the German Civil Code.
I am a single owner. Can I start this?
Yes. You can submit the property, we assess it and provide offer and documents so that the manager can put them on the agenda of the next meeting.
What does the assessment cost?
Nothing. Assessment, site visit and offer are free of charge and without obligation. Kola NetZero is paid by the provider.
Does your association qualify? Let us find out.
Energy certificate and heating cost statements are enough to start. Feedback within 5 working days, free and without obligation.
Submit property with documents