Better energy class.
Fixed heat costs.
No investment.
Gas heating, a poor energy class, a rising CO₂ price and tenants asking about service charges. A provider builds, finances and operates the new heat supply for your apartment building. You only buy heat at a fixed price.

- €0investment for the conversion
- up to 5 classesbetter energy class
- 15 yearsfixed heat price, at least 10
The old heating costs more every year, even while it still runs.
CO₂ costs hit the landlord
Since 2023 landlords and tenants share the CO₂ levy. The worse the building, the larger your share, up to 95% in the lowest bracket. And the CO₂ price keeps rising.
The energy class lowers the value
Banks ask for the energy certificate with every financing. Buildings in classes F to H sell worse and get worse terms.
Retrofitting ties up capital
A new boiler room with heat pumps quickly costs six figures. That money is missing for acquisitions, repayment or other measures in the portfolio.
Where your building needs heat
- Flats
- Bathrooms and hot water
- Stairwells
- Boiler room
- Basement and ancillary rooms
- Commercial units
Buy heat instead of owning a heating system
Own retrofit
- Investment from equity or a loan
- You plan, tender and supervise the conversion
- An outage in winter is your risk
- Maintenance and repairs at your cost
- Heat price fluctuates with the market
With NetZero
- The provider bears the conversion costs
- The provider plans, finances and operates
- Fault service and response times in the contract
- Maintenance and servicing included
- Heat price fixed for 10 to 15 years
You pass the heat costs on to tenants through the service charges as before. Kola NetZero is paid by the provider, the assessment is free for you.
What gets installed at the building
Planning, conversion and operation are handled by the provider. Tap the points on the image.

Not required for the switch. If the roof and the numbers fit, the provider can add photovoltaics.
Take over most of the heat generation, the existing boiler stays in the system. The outdoor units stand enclosed on the property.
The heat pumps are connected to the existing boiler room. Radiators and pipes in the flats stay as they are.
Sensors and valves in the basement continuously balance the pipe network and lower the flow temperature without any flat getting cooler.
No intervention in the flats
Work only takes place in the boiler room, on the property and on the roof. The switch-over is planned outside the heating season, tenants barely notice it.
Assessment
Site visit of boiler room and roof, design based on the building's actual consumption.
Tenant notice
The switch to heat supply is announced to tenants in good time, the provider supplies templates.
Implementation
Work in the boiler room, outside and on the roof, switch-over outside the heating season.
Operation
Maintenance, fault service and billing sit with the provider.
- No access to the flats
- No scaffolding on the facade
- No investment
Which apartment buildings qualify
- From 6 residential unitsNo upper limit. Several buildings of one owner are assessed together.
- Central heating systemOne system for the building, with gas, oil or district heating. Individual boilers per flat do not qualify.
- Energy class E or worseAccording to the certificate. For district heating we also look at better classes.
- One owner for the buildingPrivate, family, company or portfolio holder. Owners' associations have their own page.
- Heating costs run through youYou buy the heat and pass it on through the service charges.
What your building gains
Better energy class
Depending on the starting point up to five classes better. That counts in financing, sale and letting.
Lower CO₂ costs
Heat pumps cut CO₂ emissions significantly. Your share of the CO₂ levy falls with them.
Capital stays free
No investment in the heating. Equity and credit lines remain available for acquisitions and other measures.
From energy class G to B in under a week
Two apartment buildings in Rhineland-Palatinate, converted without any investment by the owners. The existing boiler stays in the system, the heat pumps cover most of the heat generation.
Apartment building, 12 residential units
Figures according to the heat provider's project documentation. CO₂ on a balance-sheet basis under BEHG. Energy class indicative. Property data anonymised.
Four steps to the offer
- 1
Submit the property
Address and key data, plus energy certificate and heating cost statements. Takes two minutes, we read the key data from your documents.
- 2
Calculation
We check the data and align the design with the provider. Feedback usually within 5 working days.
- 3
Offer and site visit
Written offer with a guaranteed heat price compared with your current costs, site visit of boiler room, floor space and roof.
- 4
Contract and implementation
You sign the heat supply contract, then the switch-over is scheduled outside the heating season.
Frequently asked by owners
Can I pass heat supply costs on to tenants?
Yes. Switching to heat supply is regulated in section 556c of the German Civil Code and the Heat Supply Ordinance. One condition is that the heat costs for tenants do not exceed their previous costs for heating and hot water. This is checked before the offer.
What happens to the old heating?
The existing boiler stays in the system and only kicks in on very cold days. The heat pumps generate most of the heat.
Do I have to grant access to the flats?
No. Work takes place in the boiler room, on the property and on the roof. Radiators and pipes in the flats stay unchanged.
Who handles faults?
The provider. Fault service and response times are set in the contract, maintenance and servicing are included in the heat price.
What happens if I sell the building?
The heat supply contract passes to the buyer. A better energy class and modern heating without a renovation backlog tend to be a selling point.
What does the assessment cost?
Nothing. Assessment, site visit and offer are free of charge and without obligation. Kola NetZero is paid by the provider.
Does your building qualify? Let us find out.
Energy certificate and heating cost statements are enough to start. Feedback within 5 working days, free and without obligation.
Submit property with documents